Home » 中国招标 » Tender Changes » Procurement of 4049-224SYTL22002 Procurement project of electric traction system for electric train of the first section of Tianjin Central urban area to Jinghai (suburban) railway(1) Tenders Changes Time:2022-02-25

Clarify or change:Clarification document for the procurement project of electric traction system for electric train of the first section of Tianjin Central Urban Area Jinghai (suburban) railway project (bidding No.: ****-***sytl*****)tianjinchengshiguidaozixunyouxiangongsi en…Procurement of 4049-224SYTL22002 Procurement project of electric traction system for electric train of the first section of Tianjin Central urban area to Jinghai (suburban) railway(1)

Tenders Changes

Time:2022-02-25Clarify or change:Clarification document for the procurement project of electric traction system for electric train of the first section of Tianjin Central Urban Area Jinghai (suburban) railway project (bidding No.: 4049-224sytl22002)
tianjinchengshiguidaozixunyouxiangongsi entrusted by the purchaser, invites sealed bids from eligible suppliers home and abroad for the supply of the following goods and/or service by way of International Competitive Bidding. The tender notice was released on www.chinabidding.com on2022-02-25
1、Bidding Conditions
Overview:Nanqiziya Industrial Park of the first section of Tianjin Central urban area to Jinghai (suburban) railway passes through Tuanbo new town and Jingwu Town, and finally connects with Jinghua Road Station of line 5. The introduction of the west area of Tuanbo new city into the rail transit network in the central urban area of Tianjin can lead the rapid development of Tuanbo new city and Jinghai district.
The project passes through Jinghai and Xiqing administrative regions and is mainly laid along Tuanbo Avenue and Ronghua Road. The total length of the line is about 13.4km, including about 11.28km long elevated section, about 1.38km long subgrade section and about 0.74km long underground section. There are 3 stations in total, all of which are elevated stations, including international medical city station, tuanpoxi station and jingwuzhen station, with an average station spacing of 4.34km. The maximum station spacing is 6.5km, which is located between tuanpo west station and jingwuzhen station, and the minimum station spacing is 2.9km, which is located between international medical city station and tuanpo west station. The control center of the project is located in Huayuan integrated control center, and the liyuantou depot of line 5 is used for early and short-term vehicle operation and maintenance.
The maximum gradient of the main line in this line section is 25 ‰, not more than 30 ‰ under difficult conditions, and the minimum curve radius is 300m. The maximum gradient of main line and auxiliary line in the section of line 5 is 30 ‰, 35 ‰ and the minimum curve radius is 300m. The city B electric bus is adopted, and the structural form and performance parameters of the vehicle shall meet the above conditions.
The initial number of vehicles allocated for the whole line of the first section of Tianjin Central urban area to Jinghai (suburban) railway is 10 / 42, including 6 trains in 3-car formation, and the formation mode is 2 motor vehicles and 1 Trailer; There are 4 trains in 6-car formation. The formation mode is 4 motor vehicles and 2 trailers. It is planned to be put into initial operation on June 1, 2024.
10 electric buses / 42 vehicles will be purchased in this bidding.
After passing the type test, the sample vehicle can be produced in batch.
The delivery schedule of vehicles shall meet the requirements of the delivery schedule. The delivery date of the first sample vehicle is the end of June 2023. The components of the first train of the traction system shall be delivered before the end of March 2023. The delivery date of the traction system shall meet the production requirements of subsequent trains. It is planned to open for initial operation on June 1, 2024.
The tenderer shall fully consider the impact and difficulties of the early opening of the line on the subsequent opening of the line system commissioning after the operation of the line, and set appropriate interfaces to ensure the realization of the opening objectives of each section. The tenderer shall fully consider the possibility of cooperating with partial tests such as sectional opening, which has been included in the tender offer.
Delivery place: the place designated by the tenderee (see the bidding documents for details).
Source of Funds:The tenderee has confirmed the purchase funds and will effectively ensure the smooth implementation of all contracts under the project.
Description of The Prepared Bidding Conditions:Tianjin Development and reform license[2021] No. 46 document.
2、Bidding Content
Bidding No:4049-224SYTL22002
Project Name:Procurement project of electric traction system for electric train of the first section of Tianjin Central urban area to Jinghai (suburban) railway
Place of Implementation:Tianjin
List of Products:

NO. Product Name Quantity Main Technical Data Remarks
1 Electric traction system of electric train for the first section of Tianjin Central Urban Area Jinghai (suburban) railway projec 1 set Electric traction system of 10 electric trains (42 in total) (including auxiliary power supply system, VVVF inverter and its control device, excluding gearbox and coupling, train network control and monitoring system, electrical connector (low-voltage part), pantograph, etc.), spare parts (including vulnerable and consumable parts) with a total price of not less than 5% of the contract goods.

3、Qualification Requirements For Bidder
Qualifications or Performance:3.1 the tenderer must be a rail transit vehicle traction system manufacturer registered in the people’s Republic of China (excluding Hong Kong, Macao and Taiwan), with complete manufacturing technology and corresponding production capacity of electric traction system of electric train, and capable of providing bidding goods and services; (two or more legal persons whose legal representative is the same person shall not bid at the same time in this project)
3.2 the tenderer must have a sales performance of rail transit vehicle traction system project in the people’s Republic of China (excluding Hong Kong, Macao and Taiwan) in recent five years (January 1, 2017 to the deadline for bidding), The performance of the project must be proved by the copy of the sales contract agreement signed between the tenderer and the end user (rail transit construction or operation unit) or vehicle manufacturer in recent five years (January 1, 2017 to the deadline for bidding). If it is a sales contract signed with vehicle manufacturer, the user certificate issued by the end user (rail transit construction or operation unit) is also required, And shall be stamped with the official seal of the bidder.
Joint Bids:NOT Available
Bid without the bidding documents:NOT Available
4、Acquisition of Bidding Documents
Beginning of Selling Bidding Documents:2022-01-29
Ending of Selling Bidding Documents:2022-02-10
Sell bidding?doc?online?or?not:No
To Obtain::On-site Purchase
Place:Tianjin urban rail Consulting Co., Ltd., a426, Huayuan control center, No. 36, Caizhi Road, Xiqing District, Tianjin
Price of Bidding Documents:¥15000/$2354
Additional Instructions:When purchasing the bidding documents on site, the bidder shall provide the copy of the duplicate of the business license, the original of the power of attorney of the handler and the original of the ID card of the handler; In case of epidemic situation, the scanned copies of the above documents and remittance vouchers can be sent to the mailbox of the bidding agent tjcgzxzb@163.com And send the original to the bidding agency. During the sale period of the bidding documents, they will not be sold within the time limit from 8:30 a.m. to 11:30 p.m. and from 13:30 p.m. to 16:30 p.m. (Beijing time, except legal holidays). The bidding documents will not be returned after sale.
5、Bid Submission
Deadline for Submitting Bids/Time of Bid Opening (Beijing Time):2022-03-18 10:00
Place of Bid:Bidding document submission office outside the gate of Tianjin municipal transportation infrastructure key project headquarters (opposite to Tianjin Judicial Bureau, North Road of water park, Nankai District, Tianjin)
Place of Bid Opening:Bid opening room on the second floor of Tianjin municipal transportation infrastructure key project headquarters (opposite to Tianjin Judicial Bureau, North Road of water park, Nankai District, Tianjin)
6、The bidder needs to register before the tender on www.chinabidding.com. And the evaluation results will be released on www.chinabidding.com.
7、Contact Details
Purchasers:TIANJIN SUNURBAN RAILWAY CONSTRUCTION DEVELOPMENT CO.,LTD
Add.:Tianjin Health Industry International Cooperation Demonstration Zone Health Avenue and Kunming Road intersection Demonstration Zone Management Committee 365
Contact:(business) Liu Yan (Technology) Li Xiaochun, Guo X
Tel:022-59599010、022-85568009
Bidding Agency:tianjinchengshiguidaozixunyouxiangongsi
Add.:A426 Huayuan control center, No. 36, Caizhi Road, Xiqing District, Tianjin
Contact:Liu Bing, Feng Pei
Tel:022-85568630/85568629
8、Remittance Approach:
Bank(RMB):Bank of China Tianjin Hexi sub branch
Bank(USD):Bank of China Tianjin Hexi sub branch
Account NO.(RMB):277890236747
Account NO.(USD):268791343169

天津市Transport, storage service